考虑风电接入的电力系统经济调度研究

来源:电工电气发布时间:2016-03-15 16:15 浏览次数:662

考虑风电接入的电力系统经济调度研究 

杨佳俊,徐建政 
山东大学 电气工程学院,山东 济南 250061 
 

摘 要:由于风电具有很强的随机性,风电以及风电功率的预测都有难度,因此给含风电的电力系统经济调度带来了很大困难。根据风电间歇性和随机性的不同处理方法以及旋转备用和风险对目标函数的约束,从模型以及求解方法两个方面考虑风电接入下的电力系统经济调度问题,分析了模型的优势与不足,从寻优速度、精度和收敛性比较了各种算法的优缺点,讨论了模型使用各种算法解决问题的方法和途径并指出风电接入下的经济调度问题将来所面临的工作。
关键词:电力系统;风电;经济调度;旋转备用
中图分类号:TM614 文献标识码:A 文章编号:1007-3175(2013)08-0005-05


Power System Economic Dispatch in Consideration of Wind Farm Connected into Power System 

YANG Jia-jun, XU Jian-zheng 
School of Electrical Engineering, Shandong University, Jinan 250061, China 
 

Abstract: Wind power is with very strong randomness, wind power and its power are all difficult to predicate, thus it is difficult for power network containing wind power to carry out economic dispatch. According to different treatment methods of wind power intermittent and randomness, and the target function binding from spinning reserve and risk, this paper considered power system economic dispatch issue from the model and solution method. Analysis was made to advantages and insufficiency of the model. Various algorithms were compared from aspects of searching optimized speed, accuracy and convergence. Discussion was made to the methods and ways solving problems with various algorithms. It is pointed what the economic dispatch issue under the wind power connected-in will confront with in the future.
Key words: power system; wind power; economic dispatch; spinning reserve


参考文献
[1] 杨秀媛,肖洋,陈树勇.风电场风速和发电功率预测研究[J].中国电机工程学报,2005,25(11):1-5.
[2] 范高峰,王伟胜,刘纯.基于人工神经网络的风电功率短期预测系统[J].电网技术,2008,32(22):72-76.
[3] 袁铁江,晁勤,李义岩,吐尔逊·伊不拉音.大规模风电并网电力系统经济调度中风电场出力的短期预测模型[J].中国电机工程学报,2010,30(13):23-27.
[4] Potter C W, Negnevitsky M.Very short-term wind forecasting for Tasmanian power generation[J].IEEE Transactions on Power Systems, 2006,21(2):965-972.
[5] 雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89.
[6] 戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展[J].电网技术,2007,31(20):16-23.
[7] 孟祥星,王宏.大规模风电并网条件下的电力系统调度[J].东北电力大学学报,2009,29(1):1-7.
[8] Miranda V, Hang P S.Economic dispatch model with fuzzy wind constraints and attitudes of dispatchers[J].IEEE Transactions on Power Systems, 2005,20(4):2143-2145.
[9] 陈海焱,陈金富,段献忠.含风电场电力系统经济调度的模糊建模及优化算法[J].电力系统自动化,2006,30(2):22-26.
[10] 周玮,彭昱,孙辉,等.含风电场的电力系统动态经济调度[J].中国电机工程学报,2009,29(25):13-18.
[11] 江岳文,陈冲,温步瀛.基于随机模拟粒子群算法的含风电场电力系统经济调度[J].电工电能新技术,2007,26(3):37-41.
[12] 孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.
[13] Chen C L, Lee T Y, Jan R M.Optimal wind-thermal coordination dispatch in isolated power systems with large integration of wind capacity[J].Energy Conversion and Management, 2006,47(18):3456-3472.
[14] 任博强,蒋传文,彭鸣鸿,等.基于改进遗传算法的含风电场的电力系统短期经济调度及其风险管理[J].现代电力,2010,27(1):76-80.
[15] 任博强,彭鸣鸿,蒋传文,等.计及风电成本的电力系统短期经济调度建模[J].电力系统保护与控制,2010,38(14):67-72.
[16] 邱威,张建华,刘念.含大型风电场的环境经济调度模型与解法[J].中国电机工程学报,2011,31(19):8-16.
[17] 袁铁江,晁勤,吐尔逊·伊不拉音,等.面向电力市场的含风电电力系统的环境经济调度优化[J].电网技术,2009,33(20):131-135.
[18] Lee J C, Lin W M, Liao G C, et al.Quantum genetic algorithm for dynamic economic dispatch with valve-point effects and including wind power system[J].International Journal of Electrical Power and Energy Systems, 2011,33(2):189-197.
[19] Piperagkas G S, Anastasiadis A G, Hatziargyriou N D.Stochastic PSO-based heat and power dispatch under environmental constraints incorporating CHP and wind power units[J].Electric Power Systems Research, 2011,81(1):209-218.
[20] 田廓,曾鸣,鄢帆,薛松,董军.考虑环保成本和风电接入影响的动态经济调度模型[J].电网技术,2011,35(6):55-59.
[21] 张晓花,赵晋泉,陈星莺.节能减排下含风电场多目标机组组合建模及优化[J].电力系统保护与控制,2011,39(17):33-38.
[22] 姚瑶,于继来.计及风电备用风险的电力系统多目标混合优化调度[J].电力系统自动化,2011,35(22):118-124.
[23] 黄德琥,陈继军,张岚.大规模风电并网对电力系统的影响[J].广东电力,2010,23(7):27-30.
[24] Hong Y Y, Li C T.Short-term real-power scheduling considering fuzzy factors in an autonomous system using genetic algorithms[J].The Institution of Engineering and Technology, 2006,153(6):684-692.
[25] 马瑞,康仁,姜飞,熊龙珠,李凌霄,徐慧明.考虑风电随机模糊不确定性的电力系统多目标优化调度计划研究[J].电力系统保护与控制,2013,41(1):150-156.
[26] Jabr R A, Pal B C.Intermittent wind generation in optimal power flow dispatching[J].IET Generation Transmission and Distribution,2009,3(1):66-74.
[27] 丁明,吴义纯,张立军.风电场风速概率分布参数计算方法的研究[J].中国电机工程学报,2005,25(10):107-110.
[28] Bouffard F, Galiana F D.Stochastic security for operations planning with significant wind power generation[J].IEEE Transactions on Power Systems,2008,23(2):306-316.
[29] Doherty R, Malley M O.A new approach to quantify reserve demand in systems with significant installed wind capacity[J].IEEE Transactions on Power Systems, 2005,20(2):587-595.
[30] Chen C L.Optimal wind-thermal generating unit commitment[J].IEEE Transactions on Energy Conversion, 2008,23(1):273-280.
[31] 张粒子,周娜,王楠.大规模风电接入电力系统调度模式的经济性比较[J].电力系统自动化,2011,35(22):105-110.
[32] 王天施,苑舜.风力发电对电网的影响及对策[J].高压电器,2010,46(8):89-92.
[33] 肖永山,王维庆,霍晓萍.基于神经网络的风电场风速时间序列预测研究[J].节能技术,2007,25(2):106-108.