超特高压变电站便携式气动短路接地装置研制及应用

来源:电工电气发布时间:2017-09-21 13:21 浏览次数:16
超特高压变电站便携式气动短路接地装置研制及应用
 
吴胜,廖军,黄伟民
(国网安徽省电力公司检 修公司, 安徽 合肥 230601)
 
    摘 要:超高压及特高压变电站因其电压等级高,安全距离大,使得设备垂直高度大,给接地线的装拆带来巨大挑战。针对超高压及特高压变电站装拆接地线的需求,研制了一种便携式气动短路接地装置,介绍了短路接地装置的结构设计、部件设计,并计算短路接地装置的相关参数。该装置成功应用于超高压及特高压变电站设备装拆接地线,具有体积小、重量轻、操作简单、安全可靠等特点,为设备检修工作带来巨大便利。
    关键词:超高压;特高压;变电站;便携式;气动;短路接地
    中图分类号:TM645     文献标识码:B      文章编号:1007-3175(2017)09-0056-04
 
Development and Application of Portable Pneumatic Grounding Device in Ultra-High Voltage Substation
 
WU Sheng, LIAO Jun, HUANG Wei-min
(State Grid Anhui Maintenance Company, Hefei 230601, China)
 
    Abstract: The ultra-high and extra-high voltage transformer substations have the high voltage level and the long safe distance with the high vertical height of the equipment, which brings great challenges for the installation and disassembly of the grounding wire. According to the requirement of the installation and disassembly of the grounding wire of ultra-high and extra-high voltage transformer substation, this paper developed a kind of portable pneumatic grounding device, introduced the structure and component design of short-circuit grounding device and calculated its related parameters. This device is successfully applied in the ultra-high and extra-high voltage transformer substations for the equipment to install and remove the grounding wire, with the features such as small volume, light weight, simple operation, safety and reliability and so on, which brings great convenience for the equipment overhaul work.
    Key words: ultra-high voltage; extra-high voltage; transformer substation; portable; pneumatic; short-circuit grounding
 
参考文献
[1] 张本贤.电力安全生产及防护[M ].北京:中国电力出版社,2014.
[2] 国家电网公司.国家电网公司电力安全工作规程(变电部分)[M].北京:中国电力出版社,2009.
[3] 王晓斌.变电站防止接地线事故的措施[J].中小企业管理与科技,2011(36):292.
[4] 盛连军,张滕飞,韩忠华,等.一种新型长柄多角度短路接地线的研究[J].华东电力,2011,39(10):1751-1753.
[5] 周军,郭凯翔,李雪松,等.500 kV输电线路停电检修装设接地线的措施分析[J].内蒙古电力技术,2002,20(6):42-43.
[6] 虞泽.携带型短路接地线的改进[J].云南电力技术,2008,36(1):40-41.
[7] 巫水萍,张瑜,臧和平.新型变电站接地线管理系统设计和实现[J].电气技术,2012(8):77-80.
[8] 王东海,吴健.高压电缆接地线安装质量引起的故障分析[J].电线电缆,2005(1):34-35.
[9] 戴克铭.正确使用携带型短路接地线[J].电力安全技术,2011,13(11):20-24.
[10] 戴克铭.携带型短路接地线截面积的验算[J].电力安全技术,2004,6(5):37.